Skip to content
EMERGEDPower Distribution

For investors, DFIs & strategic partners

Investment

A 25 GW gap. A pipeline built to fill it.

Emerged Power develops, builds and operates renewable assets with contracted revenue — utility PPAs, factory rooftop leases and EPC — in one of Asia's fastest-growing power markets.

Pabna Solar Park · 50 MW · in financing

Project pipeline
120 MW
Operating today
7.7 MWp
Operating, building, financing
70 MW
Revenue lines
PPA · Lease · EPC

The opportunity

Demand doubles by 2041. Renewables still supply barely 5% of the mix.

Bangladesh must roughly double its generating capacity while shifting away from imported fuel. Distributed and utility solar are the fastest megawatts to build.

Capacity the grid must serve, MW

2025 is installed capacity (upper bound); 2030 is the midpoint of projected peak demand; 2041 is projected peak demand.

020,00040,00060,000202526,700 MW203031,500 MW204152,000 MW
Figures as cited in Emerged Power market brief (2025): 25,500–26,700 MW installed; 30,000–33,000 MW by 2030; ~52,000 MW by 2041.

Renewable share of electricity, %

Today's share against stated national targets.

010203040Today5.5%2030 target20%2040 target30%
Today: 5–6% (midpoint shown). Targets are placeholders pending confirmation against current national policy.

C&I rooftop solar: addressable potential vs installed, MW

Industrial and commercial roofs technically suitable for solar, against cumulative rooftop installations.

  • Installed rooftop solar
  • Addressable C&I rooftop potential
02,0004,0006,0002024202520262027202820292030≈4 GW untapped5,200 MWAddressable1,400 MWInstalled
Illustrative placeholder estimate pending a cited rooftop-potential study. 2026–2030 installed values are projections.

Why C&I first

Export factories pay the highest tariffs and lose the most to outages.

New capacity needed by 2041
≈25 GW
Build time, factory rooftop
16 wks

Project pipeline

120 MW, from operating rooftops to a utility solar park.

Stage-gated: nothing moves to financing without land or roof rights, a grid or net-metering route and a signed offtake.

Operational
7.7MW
2 projects
Construction
12.0MW
1 project
Financing
50.0MW
1 project
Development
15.5MW
2 projects
Feasibility
35.0MW
2 projects
  • C&I rooftop & hybrid portfolio7 operating sites
    Type
    Rooftop · Hybrid · Off-grid
    Capacity (MW)
    6.5
    Location
    Multiple districts
    Stage
    Operational
    COD
    2024–25
  • Floating solar pilotIndustrial lagoon
    Type
    Floating
    Capacity (MW)
    1.2
    Location
    Mymensingh
    Stage
    Operational
    COD
    Jan 2026
  • RMG cluster rooftop programmeRESCO lease, 14 roofs
    Type
    Rooftop lease
    Capacity (MW)
    12.0
    Location
    Gazipur
    Stage
    Construction
    COD
    Q1 2027
  • Hybrid + ESS portfolio6.5 MWp / 4 MWh
    Type
    Hybrid + storage
    Capacity (MW)
    6.5
    Location
    Narayanganj
    Stage
    Development
    COD
    Q3 2027
  • EPZ rooftop lease programmeExport-zone tenants
    Type
    Rooftop lease
    Capacity (MW)
    9.0
    Location
    Chattogram
    Stage
    Development
    COD
    Q4 2027
  • Pabna Solar Park20-yr PPA, grid-connected
    Type
    IPP
    Capacity (MW)
    50.0
    Location
    Pabna
    Stage
    Financing
    COD
    2028
  • Floating solar Phase 2Reservoir array
    Type
    Floating
    Capacity (MW)
    15.0
    Location
    Mymensingh
    Stage
    Feasibility
    COD
    2028
  • Grid-support BESS20 MW / 40 MWh
    Type
    Energy storage
    Capacity (MW)
    20.0
    Location
    Sirajganj
    Stage
    Feasibility
    COD
    2029

Total 120.2 MW across 8 projects

Capacities in MWp (solar) or MW (storage). Stages and COD dates indicative and subject to change.

Business model

Three revenue lines, one delivery team.

Long-dated contracted income from assets we own, balanced by near-term cash from building and maintaining plants for others.

Utility-scale · grid-connected

01 · Contracted

45% of 2030 revenue target

IPP under long-term PPA

Utility-scale plants we develop, finance and operate, selling every unit to the state offtaker at a fixed tariff.

Counterparty
State utility offtaker
Tenor
20 years
Revenue
Per-kWh tariff

02 · Recurring

35% of 2030 revenue target

Rooftop lease & C&I PPA

We own the plant on a factory roof; the owner pays per unit, below their grid tariff, with no capex.

Counterparty
Export factories, commercial owners
Tenor
10–15 years
Revenue
Monthly per-kWh bill

03 · Near-term cash

20% of 2030 revenue target

EPC & O&M services

Turnkey construction for owners who buy outright, followed by annual monitoring and maintenance contracts.

Counterparty
Plant owners, developers
Tenor
Project + 1–5 yr AMC
Revenue
Milestone fees, annuity AMC

Target revenue mix, 2030

Indicative · management target, not a forecast

  • IPP under long-term PPA 45%
  • Rooftop lease & C&I PPA 35%
  • EPC & O&M services 20%

Returns & risk

Returns you can underwrite. Risks we name first.

%

Target project IRR

C&I rooftop lease, pre-tax

%

Target equity IRR

IPP, post-financing

yrs

Weighted contract tenor

across contracted pipeline

×

Minimum DSCR

portfolio lending covenant

Indicative targets for discussion only. Not an offer of securities or a forecast of returns; subject to due diligence, financing terms and tariff outcomes.

Risk

How we mitigate it

  1. 01Offtaker payment

    Sovereign-backed PPAs for IPP; credit-screened export factories, security deposits and relocation rights on leases.

  2. 02Currency & tariff

    Equipment priced and hedged at financial close; lease tariffs indexed to the grid tariff with a floor.

  3. 03Grid curtailment

    Hybrid and storage designs, zero-export control on rooftops, deemed-generation terms sought in PPAs.

  4. 04Construction & yield

    Tier-1 equipment, P50/P90 yield studies, in-house EPC with performance guarantees and 24/7 monitoring.

  5. 05Policy & permitting

    Projects built to SREDA net-metering and BERC frameworks; permits and land secured before financing.

Governance

Structured for lenders from day one.

Ring-fenced project companies, audited accounts and an E&S system that stands up to DFI due diligence.

Compliance frameworks

  • SREDA registration & net-metering
  • BERC tariff and licensing framework
  • Department of Environment clearance
  • Bangladesh Bank foreign-exchange rules
  • BNBC 2020 structural compliance
  • Labour Act & site HSE standards

Board & controls

  • 01Board with independent oversightBoard chaired separately from management, with an independent director and audit committee.
  • 02Audited accountsAnnual statutory audit by an ICAB-registered firm; project SPVs ring-fenced for lenders.
  • 03E&S management systemEnvironmental and social screening aligned with IFC Performance Standards on every project.
  • 04Anti-bribery & procurementWritten code of conduct, two-signature procurement and supplier due diligence.

Who we build with

Development finance

DFIs and green-finance lenders for project debt and blended facilities.

Tier-1 equipment

Module, inverter and LFP battery manufacturers with local warranty support.

Offtakers & utilities

State utility offtake for IPP; export-oriented manufacturers for C&I.

Advisers

Legal, technical and E&S advisers engaged at feasibility and financial close.

Named partners and lenders are shared under NDA.

PDF · 12 pages · Updated 2026

Investor overview

Pipeline, portfolio performance, business model and governance in one document. The full data room is shared under NDA.

Download overview

Investor enquiry

Talk to the people who model the projects.

Tell us your mandate. We'll come back with the projects that fit it, a call with our finance director and access to the data room under NDA.

  • 01Reply within two working days
  • 02Intro call with finance & development
  • 03NDA, data room and site visit
+880 1670797616

Sunday–Thursday, 09:00–17:00

House #91, 2nd Floor, Road #13, Block D, Banani, Dhaka-1213

Investor enquiry form

Equity, debt and strategic partnerships.

Mandate, preferred instruments (equity, debt, blended) and the projects you'd like to discuss.

* Required. Shared only with our finance team.

Free · no obligation

Your roof is already a power plant. Let's prove it.

A free site assessment gives you a sized system, a savings forecast and a payback period — in writing, within 10 working days.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616