For plants that cannot stop production to get solar built

Installation

Built by our own crews, tested before we hand you the keys.

Structure, modules, inverters, cabling and protection — installed by directly employed teams working to a method statement, around your shifts, and signed off against IEC 62446-1 before energisation.

850 kWp install · Chattogram

Own crews
38 installers
Typical build
6 – 10 weeks
Night & holiday work
Standard
Lost-time incidents
Zero

What we install

Three trades, one crew, one accountable manager.

Mechanical, electrical and grid work sit under a single site manager, so nothing falls between contractors.

01

Mechanical

Roof preparation, rail and clamp systems set out to the approved layout, torque-controlled and corrosion-protected.

  • Purlin and sheet checks before the first fixing
  • Anodised rail, SS304 fasteners
  • Non-penetrating clamps where the profile allows
  • Walkways and safety lines reinstated
02

Electrical

DC stringing, combiner boxes, inverters, AC cabling and protection installed to the single-line diagram.

  • Labelled strings and continuity checks
  • Type II SPD on DC and AC
  • Earthing to IEC 62305
  • Cable routes sized for volt drop
03

Grid & commissioning

Synchronisation with the utility, protection settings proven, and the plant handed over with a full test pack.

  • IEC 62446-1 commissioning tests
  • Insulation and IV-curve baselines
  • Utility inspection and meter change
  • Monitoring live before handover

Build timeline

Ten weeks from mobilisation to energisation.

Indicative for a 500 kWp – 2 MWp rooftop. Your programme is fixed at design freeze and tracked weekly.

Phase
W012345678910

01Mobilisation & HSE induction

Site manager

02Setting out & structure

Mechanical crew

3 weeks

03Module installation

Mechanical crew

4 weeks

04DC stringing & combiners

Electrical crew

3 weeks

05Inverters, AC & protection

Electrical crew

3 weeks

06Testing & commissioning

QA/QC

Milestone: energisation and handover

Working around you

Your lines keep running while we build.

A rooftop install should cost you nothing in production. We plan the programme around your shifts and reduce the tie-in to a single, scheduled outage.

Installation is included in every EPC contract — and available on its own if your design is already done.

See the EPC scope
  • We work around your shifts

    Roof work planned against your production calendar, with night and holiday windows where a line cannot stop.

  • One shutdown, scheduled

    Only the final tie-in needs an outage — typically a few hours, booked weeks ahead and rehearsed.

  • Clean as we go

    Daily housekeeping, swarf control and drainage checks so the roof is handed back in better condition.

  • One site manager

    A named site manager and a daily progress log with photos, so you never chase an update.

Quality & safety

Nothing is energised until it is proven.

Every install is documented: method statements before mobilisation, torque and insulation records during, and a commissioning pack at handover that your lender or insurer can read.

Installation quality and safety standards
Method statement & risk assessmentApproved before mobilisation
Toolbox talksEvery shift, logged
Working at heightFull harness, anchor points, trained crews
Torque controlCalibrated tools, sampled and recorded
Commissioning standardIEC 62446-1 with documented results
Handover packAs-built drawings, test results, warranties, O&M manual

Chattogram · June 2024

Installation case study

850 kWp rooftop for a bonded warehouse

Result
1.1 GWh
clean energy per year
Sector
Commercial
Client
Logistics & bonded warehouse

The challengeCoastal salt air and cyclone-season wind loads on a lightweight steel roof.

The resultCame through the 2024 cyclone season with zero module displacement and 99.6% availability.

FAQ

What plant managers ask before we mobilise

Downtime, crews, duration, handover and the monsoon.

Ask an engineer

Almost never. Roof and DC work happens while you run; only the final grid tie-in needs a short planned outage, which we book with you weeks ahead.

Our own directly employed crews under a named site manager — not a chain of subcontractors. Every installer is inducted, trained for working at height and covered by our HSE policy.

Six to ten weeks from mobilisation to energisation for a 500 kWp to 2 MWp rooftop, depending on roof type, access and utility scheduling.

As-built drawings, the IEC 62446-1 commissioning test pack, insulation and IV-curve baselines, equipment warranties, the O&M manual and monitoring already live.

We plan around it: structural work is front-loaded into dry windows, open DC terminations are never left overnight, and roof penetrations are sealed and tested the same day.

Free · no obligation

Your roof is already a power plant. Let's prove it.

A free site assessment gives you a sized system, a savings forecast and a payback period — in writing, within 10 working days.

What you receive

  • 01Site and access survey
  • 02Installation programme around your shifts
  • 03Commissioning and handover pack
Prefer to talk? +880 1670797616