For remote sites & diesel-dependent facilities

Off-grid Solar

Diesel-free power where the grid doesn't reach.

A self-contained solar plant — panels, charge control, LFP battery bank and inverter — sized to carry your load day and night without a utility connection. Your genset moves from daily workhorse to last-resort standby.

220 kWp off-grid · Sylhet

System size
5 – 500 kWp
Replaces diesel at
Tk 28–32 / kWh
Payback vs diesel
2.5 – 4 yrs
Battery autonomy
12 – 36 h

Who it's for

For sites the grid never reached — or keeps failing.

If a diesel genset is your main source of electricity, every unit costs you Tk 28–32 before maintenance. Off-grid solar replaces most of those units with sunlight you store.

Grid-connected but tired of outages? Hybrid solar usually pays back faster.

01

Remote sites

Tea estates, char-land farms, island and hill-tract facilities several kilometres from a usable feeder.

No feeder within reach

02

Grids you can't trust

REB and PBS areas where outages run for hours every day and voltage swings burn out motors.

Genset runs every day

03

Rural processing & cold chain

Rice mills, hatcheries, cold storage and agro-processing where diesel is the largest operating cost.

Diesel > 30% of opex

04

Clinics, schools & pump stations

Health complexes, schools, telecom sites and irrigation pumps that need quiet, fuel-free supply.

Small, critical loads

System architecture

Five components. No utility in the loop.

Energy moves one way through the day: from the roof, into storage, out to your loads. Every stage is monitored remotely.

  1. Solar arrayTier-1 modules
    DC
  2. Charge controllerMPPT · DC-coupled
    Charge
  3. LFP battery bankDay + night storage
    DC bus
  4. Off-grid inverterPure sine · 3-phase
    400 V AC
  5. Site loadsMotors, cold rooms, lights
An existing diesel genset connects to the inverter's AC input as automatic standby.Solar & AC powerBattery charge & discharge
  • 01Solar arrayTier-1 modules on roof, ground or carport structures, strung for the controller's voltage window.
  • 02MPPT charge controllerTracks the maximum power point of every string and charges the battery without overcharging it.
  • 03LFP battery bankStores daytime surplus for night and cloudy days; the BMS protects every cell from heat and deep discharge.
  • 04Off-grid inverterForms a stable 230/400 V supply with the surge headroom motors and compressors need to start.
  • 05Your loadsCritical circuits are prioritised; an existing genset stays wired in as automatic standby.

Component specification

What goes into a plant that has to run alone.

No grid to fall back on means no weak link. Every component is IEC-certified and chosen for heat, humidity and remote serviceability.

Download Capability Profile
Off-grid solar component specification
Solar array
ModulesTier-1 mono PERC / TOPCon, 550–620 WpIEC 61215 / 61730, PID-resistant
MountingHot-dip galvanised steel or anodised aluminiumRoof, ground or carport
Wind designBNBC 2020 basic wind speed for the district
Charge control
ControllerMPPT, 98–99% tracking efficiency
DC protectionString fuses, DC isolators, Type II surge protection
Battery bank
ChemistryLiFePO₄ (LFP), rack or cabinet mounted
Usable capacity10 kWh – 1 MWhSized on the worst monsoon month
Cycle life6,000+ cycles at 80% depth of discharge
ManagementCell-level BMS, thermal and short-circuit protection
Inverter
Rating5–250 kW, single- or three-phase, pure sine wave
Surge capacity2–3× rated power for 5 sMotor and compressor starts
Genset inputAutomatic start on low battery state of charge
Monitoring & warranty
Monitoring4G remote portal, SMS alarms, monthly report
EarthingLightning protection and earthing to IEC 62305
WarrantiesModules 12 yrs · battery 10 yrs / 6,000 cycles · inverter 5 yrsExtendable under AMC

Sizing by load profile

Sized to your load, not a catalogue.

Four reference designs. Your survey replaces these with your own measured load curve and worst-month yield.

  • Rural clinic or schoolDaytime-heavy, lights, fans, cold chain
    Daily energy
    40 kWh
    PV array
    15 kWp
    Battery (usable)
    25 kWh
    Inverter
    10 kW
    Diesel displaced / yr
    ~3,700 L
    Indicative capex
    Tk 15 lakh
    Payback
    3–3.5 yrs
  • Poultry farm or hatchery24-hour ventilation and incubators
    Daily energy
    120 kWh
    PV array
    45 kWp
    Battery (usable)
    80 kWh
    Inverter
    25 kW
    Diesel displaced / yr
    ~11,000 L
    Indicative capex
    Tk 46 lakh
    Payback
    3–4 yrs
  • Agro or rice millSingle daytime shift, motor loads
    Daily energy
    350 kWh
    PV array
    130 kWp
    Battery (usable)
    150 kWh
    Inverter
    80 kW
    Diesel displaced / yr
    ~32,000 L
    Indicative capex
    Tk 1.1 crore
    Payback
    2.5–3 yrs
  • Tea estate factoryWithering & drying, day and night
    Daily energy
    600 kWh
    PV array
    220 kWp
    Battery (usable)
    600 kWh
    Inverter
    150 kW
    Diesel displaced / yr
    ~41,000 L
    Indicative capex
    Tk 2.9 crore
    Payback
    3.5–4 yrs

Indicative only. Basis: 1,300 kWh/kWp/yr derated for the monsoon month, LFP at 80–90% depth of discharge, diesel at ~0.28 L/kWh and Tk 28–32/kWh. Tea estate row reflects our Sylhet project.

Installation timeline

Survey to switch-on in about 14 weeks.

A typical 130 kWp programme. Remote sites add one to three weeks for logistics; the genset keeps running until commissioning.

Phase
W01234567891011121314

01Site survey & load audit

Emerged engineering

02Design & battery sizing

PVsyst + autonomy model

03Procurement

Modules, LFP, inverters

5 weeks

04Civil & mounting structure

Site team

3 weeks

05Electrical & battery room

Site team

3 weeks

06Testing & commissioning

Emerged engineering

07Handover & operator training

O&M team

Phase durationMilestone sign-off

Cost & payback

The cheapest diesel is the diesel you don't burn.

Off-grid solar costs more upfront than a genset, but each unit it delivers costs roughly a third as much. Fuel savings typically repay the plant in two and a half to four years.

Ways to pay

  • 01Capex purchaseOwn the plant outright; the fastest route to the lowest lifetime cost.
  • 02Lease-to-ownSpread the cost over 36–60 months so fuel savings fund the instalments.
  • 03Green financeWe prepare the technical file for IDCOL and bank green-refinance applications.

Cost per unit of electricity

Tk per kWh. Diesel includes fuel and genset O&M; solar is levelised over 20 years.

010203040Diesel34Solar + LFP10Grid12
Indicative Emerged Power estimates, 2025. Grid shown as a reference blended C&I tariff.

Worked example · 130 kWp agro mill

Indicative capex
Tk 1.1 crore
Diesel avoided
~32,000 L / yr
Fuel + genset O&M saved
~Tk 38 lakh / yr
Simple payback
~2.9 yrs
20-year net saving
~Tk 5.5 crore

Sylhet · February 2025

Case study · Off-grid

220 kWp off-grid system for a tea estate factory

Result
41,000 L
diesel avoided per year
Sector
Industrial
Client
Tea estate & processing unit

The challengeA withering-and-drying factory 14 km from the nearest reliable feeder, running on two diesel gensets.

The resultGensets now run under 300 hours a year. Diesel purchases fell by roughly 41,000 litres annually.

FAQ

Off-grid questions, answered

Autonomy, monsoon cloud, gensets and batteries.

Ask an engineer

Most sites land between 12 and 36 hours. Adding battery for multi-day autonomy gets expensive quickly, so we usually size for one night plus a cloudy morning and keep the existing genset as automatic standby for long monsoon spells.

Output on heavily overcast days can fall to 40–60% of normal. The system is sized on the worst month (usually July or August), the controller prioritises critical loads, and the genset starts automatically if the battery reaches its reserve level.

Yes, and we recommend it. The genset connects to the inverter's AC input and only starts when the battery is low, so it runs a few hundred hours a year instead of every day — our Sylhet tea estate client's gensets now run under 300 hours annually.

We specify inverters that can be upgraded or paired with a grid-tie unit, so an off-grid plant can become a hybrid system when a reliable REB or PBS feeder arrives — without replacing panels or batteries.

LFP lasts around 6,000 cycles against 1,200–1,500 for lead-acid, tolerates deeper discharge, needs no topping up or acid handling and loses less capacity in Bangladesh's heat. The upfront cost is higher, but the cost per stored unit over the system's life is lower.

Module cleaning every 2–4 weeks in the dry season, a quarterly visual and thermal inspection, and remote battery and inverter monitoring. We offer annual maintenance contracts with a guaranteed response time for remote sites.

Free · no obligation

Find out how much diesel your site can stop burning.

Share your genset logs or fuel bills. We'll size a system to your real load and show the payback against diesel — free.

What you receive

  • 01Load audit from genset & fuel records
  • 02Sized PV, battery and inverter design
  • 03Diesel saving and payback forecast
Prefer to talk? +880 1670797616