220 kWp off-grid system for a tea estate factory

41,000 L diesel avoided per year — Tea estate & processing unit, Sylhet.

Capacity
220 kWp + 600 kWh
Location
Sylhet
Commissioned
February 2025
Solution type
Off-grid

Case study

From first survey to measured result.

Client
Tea estate & processing unit
Sector
Industrial
District
Sylhet
System
220 kWp + 600 kWh

1. The challenge

A withering-and-drying factory 14 km from the nearest reliable feeder, running on two diesel gensets.

2. Our approach

220 kWp ground and rooftop mix, 600 kWh LFP bank, genset kept as last-resort backup under automatic control.

3. The result

Gensets now run under 300 hours a year. Diesel purchases fell by roughly 41,000 litres annually.

41,000 Ldiesel avoided per year

Performance

Generation, measured every month.

Metered AC output from the plant's monitoring platform, against the P50 forecast we committed to at design stage.

Generated over 12 months
273MWh
Against P50 forecast
+3.4%vs 264 MWh
Specific yield
1,241kWh/kWp·yr

Monthly generation, MWh

Actual metered output against the P50 expected yield. Shaded area shows generation above forecast.

  • Expected (P50 model)
  • Actual generation
010203040JanMarMayJulSepNov
Source: plant monitoring platform, 12-month record.

The generator shed is quiet most days now.

Estate ManagerTea estate, Sylhet41,000 Ldiesel avoided per year

Free · no obligation

Want numbers like these on your own site?

Share a year of electricity bills and a roof or land plan. We'll model the yield, the payback and the right system — free and without obligation.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616