Services · EPC

Engineered, procured and built under one accountable contract.

One team takes your plant from structural survey to grid synchronisation — with a named engineer, a written deliverable at every stage, and nobody else to blame if it underperforms.

SLD-03 · IFC drawings · Rev C

Delivered EPC capacity
7.7 MWp
1 MWp rooftop build
16–18 weeks
Workmanship warranty
5 years
Design standards
IEC · BNBC 2020

End-to-end scope

Three disciplines. One signature on the contract.

Split EPC contracts fail at the seams — the designer blames the supplier, the supplier blames the installer. We own all three, and each hands over a document you keep.

01 / 03Weeks 1–6

Engineering

The roof, the load and the grid — modelled before a single bolt is ordered.

  1. E.01Structural survey and purlin load check to BNBC 2020 wind loads
  2. E.02Shading analysis and PVsyst P50 / P90 yield model
  3. E.03Load-profile, tariff and diesel-offset study
  4. E.04Single-line diagram and protection coordination
  5. E.05Net-metering / grid-connection filing with SREDA and the utility
  6. E.06IFC drawings, BOQ and method statement

You receiveDesign basis report · IFC drawing set

02 / 03Weeks 4–11

Procurement

Bankable equipment, inspected at the factory and tracked to your roof.

  1. P.01Tier-1 module and inverter tender — three quotes minimum
  2. P.02Factory audit and pre-shipment inspection with EL imaging
  3. P.03OEM warranties back-to-back, registered in your name
  4. P.04LC, shipping and Chattogram port clearance
  5. P.05Incoming inspection and flash-test sampling on site
  6. P.06Critical spares list and stock plan

You receiveInspection reports · warranty certificates

03 / 03Weeks 11–18

Construction

Supervised crews, a written HSE plan and production that keeps running.

  1. C.01HSE plan, permits and site mobilisation
  2. C.02Structure and module mounting with torque-marking
  3. C.03DC / AC cabling, earthing and lightning protection
  4. C.04Inverter, ESS and switchgear installation
  5. C.05IEC 62446-1 testing: IV curves, insulation, IR scan
  6. C.06Grid synchronisation, COD and O&M handover

You receiveAs-built drawings · commissioning pack

Project execution timeline

A 1 MWp rooftop, contract to COD in 18 weeks.

Design and utility filings run in parallel with procurement, so the long-lead items never wait on paperwork. Every diamond is a hold point you sign off.

Phase
W024681012141618

01Survey & structural assessment

Engineering

02Design, yield model & approvals

Engineering · SREDA & utility filings

4 weeks

03Tender, factory inspection & order

Procurement

5 weeks

04Shipping, port clearance & delivery

Procurement · logistics

3 weeks

05Installation — structure, modules, electrical

Construction · HSE-supervised crews

5 weeks

06Testing, commissioning & grid sync

Construction · utility witness

  • W2Survey report
  • W6IFC drawings
  • W9Pre-shipment inspection
  • W12Equipment on site
  • W18COD & handover

Typical programme for a 1 MWp grid-tied rooftop using imported Tier-1 equipment. Utility net-metering approval can add 2–6 weeks; hybrid systems with ESS add 2–4 weeks.

Quality & safety standards

Built to the standards your lender's engineer will check.

Every design, delivery and connection is checked against a named standard — and every test result goes into the handover pack, not a drawer.

Lost-time injuries
0
2024–2025 projects
Strings IV-tested
100%
at commissioning
Hold points
5
client-witnessed per project
Design, equipment, construction and safety standards
Design
Array & electrical designIEC 62548 · IEC 60364-7-712
Structural & wind loadBNBC 2020Cyclone-zone checks for coastal sites
Grid connectionSREDA net-metering guideline · utility grid code
Equipment
PV modulesIEC 61215 · IEC 61730PID-resistance and salt-mist (IEC 61701) for coastal sites
InvertersIEC 62109 · IEC 62116 anti-islanding
Battery storageIEC 62619 · UL 9540A
Construction QA
Incoming inspectionEL and flash-test sampling per shipment
MechanicalTorque-marked fixings, photographed per row
CommissioningIEC 62446-1 test pack, IR scan at COD
Health & safety
Management systemISO 45001-aligned HSE plan
Work at heightPermits, harnesses and engineered lifelines
Electrical isolationLock-out / tag-out on every DC and AC isolation
Daily practiceToolbox talk and signed permit before work starts

Equipment sourcing partners

Vendor-neutral. Tier-1 only.

We don't sell one brand. We tender each project against bankable manufacturers and specify what fits your roof, your climate and your lender.

  • Bankable manufacturersBNEF Tier-1 modules and inverters with a lender-accepted track record.
  • Certified, locally testedIEC certificates plus test reports accepted by SREDA and the utility.
  • Service on the groundOEM service presence in Bangladesh, so warranty claims don't stall.

Modules

4 approved manufacturers

LLONGiMono PERC · TOPCon
JJinkoSolarN-type TOPCon
TTrina SolarVertex
JJA SolarDeepBlue

Inverters

3 approved manufacturers

HHuaweiString inverters
SSungrowString · central
SSMASunny Tripower

Storage

3 approved manufacturers

CCATLLFP cells
BBYDLFP systems
SSungrowPowerStack ESS

Balance of system

3 approved manufacturers

SSchneider ElectricSwitchgear
PPhoenix ContactSPDs · connectors
BBRB CableDC / AC cable

Manufacturers shown are examples of equipment we specify. Final selection is made per project and confirmed in the BOQ.

Gazipur · March 2025

EPC case study

1.8 MWp hybrid rooftop for a knit composite plant

Result
31%
lower grid bill
Sector
RMG & Textiles
Client
Knit composite manufacturer

The challengeThree sheds, 212,000 sq ft of corrugated roof, and six to nine hours of monthly load-shedding that stopped dyeing lines mid-batch. Diesel backup was costing more per unit than the grid.

The resultThe dyeing lines now ride through outages on battery, diesel runtime is down 78%, and the plant's monthly grid bill fell by 31% in the first full quarter.

Completed EPC projects

7.7 MWp built across 8 plants.

Rooftops, off-grid sites, storage and floating arrays — each designed, procured and commissioned by our own team.

All clients & projects

FAQ

EPC questions we hear every week

Timelines, roofs, approvals and warranties — answered by the engineers who deliver them.

Ask an engineer

Typically 16–18 weeks from signed contract to commercial operation. Equipment lead time and utility approvals are the swing factors; we start filings in week two so they run in parallel with procurement.

Most RMG and industrial roofs can, but we never assume. Every project starts with a structural survey; a typical rooftop array adds 12–15 kg/m². Where purlins fall short, we design strengthening or a lighter layout before quoting.

We do. We prepare and file the SREDA net-metering application and the distribution utility's connection paperwork, and attend inspections through to meter installation.

OEM product and performance warranties on modules and inverters, registered in your name, plus our own workmanship warranty on the installation. Terms are set out in the contract per project.

Yes. We deliver EPC-only scopes under your owner's engineer or lender's technical adviser, with hold points and reporting to match their requirements.

Partner with us (EPC)

Build Bangladesh's next gigawatt with us.

Our pipeline is growing faster than any one team can deliver. We work with qualified subcontractors, fabricators, OEMs and developers who hold our standards on site.

What we look for

  • Valid trade licence and electrical contractor licence (as applicable)
  • Documented HSE record and insurance
  • References from two completed projects
01

Installation subcontractors

Mechanical and electrical crews with rooftop PV experience.

02

Structural & civil fabricators

Galvanised steel, roof strengthening and ground-mount civils.

03

OEMs & distributors

Modules, inverters, storage and BOS with Bangladesh service.

04

Developers & landowners

Rooftops, land or water bodies that need an EPC partner.

PDF · company, EPC credentials & project list

Emerged Power capability profile

Our engineering team, standards, equipment partners and completed projects in one document — ready for your procurement committee or lender.

Download profile

Free · no obligation

Start with a structural survey, not a quotation.

We survey your roof, study three years of bills and return a sized design, a yield forecast and a fixed EPC price.

What you receive

  • 01Structural & shading survey
  • 02PVsyst yield model and single-line diagram
  • 03Fixed-price EPC proposal with programme