Skip to content
EMERGEDPower Distribution

Services · Build · Operate · Protect

We build it. Then we stay for 25 years.

Most solar plants lose their forecast after handover, not before it. Emerged Power designs and builds your plant, watches every string from our Dhaka NOC, and maintains it on a written schedule — under one contract and one set of numbers.

Lifecycle covered
Survey → Year 25
Monitoring
24/7 · 365 days
P1 acknowledge
From 15 min
Target PR
≥ 80%

The lifecycle we cover

No hand-off between the people who built it and the people who run it.

The engineer who sized your strings is on the same team as the analyst watching them at 2 a.m. That is why faults get fixed, not argued about.

  1. EPC · Week 1–6

    Survey & design

    Structural survey, PVsyst yield model, single-line diagram and utility filings.

  2. EPC · Week 4–11

    Procure

    Tier-1 equipment tendered, factory-inspected and cleared through Chattogram.

  3. Installation · Week 11–18

    Build & commission

    HSE-supervised installation, IEC 62446-1 testing and grid synchronisation.

  4. Monitoring · Day 1 →

    Monitor

    String-level data every 5 minutes, NOC alarm triage and monthly reports.

  5. Maintenance · Monthly

    Maintain

    Soiling-driven cleaning, torque and thermal checks, pre-monsoon readiness.

  6. Maintenance · Year 10–25

    Test & extend

    IV-curve campaigns, inverter replacement planning and life-extension studies.

Four services

Buy one, or the whole lifecycle.

Each service stands alone — but together they share one data platform, one ticket history and one accountable engineer.

Talk to an engineer

01 · Design

EPC

Engineering, Procurement & Construction

Design, sourcing and turnkey construction under one accountable contract.

02 · Install

Installation

Mechanical, electrical and grid installation

Structure, modules, inverters and cabling installed, tested and energised by our own crews.

03 · Operate

Plant Monitoring

24/7 remote performance monitoring

String-level visibility, fault alerts and monthly performance reporting.

04 · Protect

Preventive Maintenance

Scheduled O&M and annual maintenance contracts

Cleaning, thermal imaging and IV-curve testing that protect your yield.

Plant built by someone else?We take over monitoring and O&M after a one-day handover audit — IR scan, IV sampling and a written defects list.

Book a takeover audit

Response-time SLA

A clock starts the minute an alarm fires.

Every alarm is triaged by severity. Your AMC tier sets how fast a named analyst acknowledges it and how fast a technician is standing on your roof.

Fastest acknowledge
15min
Fastest on site
8hours
Compare AMC packages
  • P1Critical
    Typical trigger
    Plant offline, more than 25% of capacity lost, arc fault, fire or safety hazard
    Basic
    Ack1 hOn site48 h
    Standard
    Ack30 minOn site24 h
    Premium
    Ack15 minOn site8 h
  • P2Major
    Typical trigger
    Inverter down, 5–25% of capacity lost, or PR more than 5 points below forecast
    Basic
    Ack4 hOn site72 h
    Standard
    Ack1 hOn site48 h
    Premium
    Ack30 minOn site24 h
  • P3Minor
    Typical trigger
    String fault, datalogger or comms loss, under 5% of capacity affected
    Basic
    AckNext working dayOn siteNext visit
    Standard
    Ack4 hOn site5 days
    Premium
    Ack2 hOn site72 h
  • P4Advisory
    Typical trigger
    Soiling trend, vegetation, drainage or cosmetic defects
    Basic
    AckQuarterly reportOn siteNext visit
    Standard
    AckWeekly digestOn siteNext visit
    Premium
    AckDaily digestOn site7 days max

Clock starts at the alarm time-stamp (Asia/Dhaka). On-site targets apply within 150 km of Dhaka or Chattogram; add 12 h beyond. Acknowledge = a named NOC analyst has triaged the alarm and contacted your site lead.

Energy output over 25 years, indexed

Year-1 output of a maintained plant = 100. The shaded area is generation an unmaintained plant never delivers.

  • Unmaintained (break-fix only)
  • With preventive O&M
0255075100Year 1Year 5Year 10Year 15Year 20Year 25+14% lifetime energy88.7With O&M73.1Unmaintained
Illustrative model: maintained plant at 0.5%/yr degradation; unmaintained plant with ~5% soiling and 2% availability loss from year 1 and ~1.0%/yr degradation. Index: year-1 maintained output = 100.

Why O&M decides your ROI

Your payback is decided on the roof, every month after handover.

A plant that loses 7% in year one and ages twice as fast never reaches the payback in its proposal.

More lifetime energy
+14%
Per MWp, 25 years
4.2GWh
  1. 01Dust takes the first 3–7% every dry monthNear brick kilns and highways, an uncleaned array loses more in a month than it degrades in ten years.
  2. 02Faults hide inside plant-level averagesOne dead string on a 1 MWp plant costs roughly 0.45 MWh a week — and never trips a plant-level alarm.
  3. 03Heat and humidity compound degradationWarranties assume ~0.5%/yr. Unmaintained sites in monsoon humidity run closer to 1%/yr through moisture ingress, PID and hotspots.

End of year 25: 88.7 vs 73.1 index points. Modelled, not measured.

Free · no obligation

Find out what your plant is really producing.

Whether we build a new plant or audit one you already own, you get a written assessment of yield, faults and the maintenance it needs.

What you receive

  • 01Site survey or existing-plant audit
  • 02Yield vs forecast and fault list
  • 03EPC, monitoring or AMC proposal
Prefer to talk? +880 1670797616