Services · Preventive Maintenance

Dust, heat and monsoon don't wait for a breakdown. Neither do we.

Scheduled cleaning, thermal imaging and IV-curve testing that keep your plant at its forecast — with an annual maintenance contract that puts response times in writing.

IR drone survey · Block B · STR-07

Cadences
Monthly · Quarterly · Annual
P1 on-site
From 8 h
Diagnostics
IR drone · IV curve
Coverage
Any EPC, any brand

Why preventive beats reactive

Break-fix looks cheaper in year one. By year ten it has cost half as much again.

An AMC is a fixed line in your budget. Reactive maintenance is a variable one — paid in call-out fees, early replacements and generation you never see on a bill.

Saved per MWp, 10 yrs
Tk68lakh
Reactive costs
1.5× more
  • 01Reactive looks cheaper in year oneNo contract fee — but soiling and slow repairs are already costing more than an AMC.
  • 02Downtime compoundsEvery fault found by a walk-round instead of a data alarm adds days of lost generation.
  • 03Heat kills inverters earlyClogged filters and loose terminals turn a 12-year inverter into a 7-year one.

Cumulative O&M cost + lost generation, Tk lakh per MWp

Standard AMC against break-fix call-outs over ten years. Reactive jumps in year 7 when a heat-stressed inverter fails early.

  • Preventive (Standard AMC)
  • Reactive (break-fix)
0100200300Yr 1Yr 2Yr 3Yr 4Yr 5Yr 6Yr 7Yr 8Yr 9Yr 10
Illustrative 1 MWp model at Tk 10.5/kWh: Standard AMC vs break-fix call-outs, including lost-generation value from soiling and downtime and one early inverter replacement.

Maintenance checklist

A written checklist, signed off on every visit.

Every task is photographed, time-stamped and logged against the asset in your monitoring portal — so you can see what was done, not just that someone came.

Tasks in the schedule
37
Cadences
3

  • Soiling-index review and cleaning dispatch
  • Visual check for cracked glass, delamination, snail trails
  • Bird-dropping and debris removal on bottom rows
  • Shading check — new structures, vegetation, water tanks

  • Clean air filters and heat-sink fins
  • Check fan operation and cabinet temperature logs
  • Read and clear event logs; record error codes
  • Inspect DC fuses and surge protection indicators

  • Reconcile inverter kWh against export meter
  • Review strings flagged below block median
  • Verify datalogger and SIM connectivity

  • Walkway, lifeline and ladder condition
  • Fire extinguisher and signage check
  • Roof drainage clear before rain

Cleaning & the dust problem

Bangladesh's dust has a season. So does our cleaning crew.

From November to April, brick-kiln smoke and highway dust settle on arrays across Gazipur, Narayanganj and Savar. An uncleaned plant there can lose 6% in a month — then the monsoon washes it clean for free.

Soiling loss by days since last cleaning

Share of energy lost to dust on the array, by site exposure.

  • Kiln / highway belt, dry season
  • Industrial suburb, dry season
  • Monsoon, rain-washed
02468Day 0Day 6Day 12Day 18Day 24Day 30Weekly clean6.3%Kiln belt3.2%Suburb0.6%Monsoon
Illustrative model of dry-season soiling (Nov–Apr) with rain-washed monsoon comparison.
Seasonal cleaning calendarCleanings per month
JFMAMJJASOND
Brick-kiln season
Storms & cyclones
Monsoon
Kiln / highway belt34 cleans / yr444432112234
Industrial suburb20 cleans / yr222221111222
Coastal · Chattogram21 cleans / yr222222111222

Indicative schedule. We adjust it monthly from each site's soiling index.

  • Soft brushes and low-TDS water — no high-pressure jets that void module warranties
  • Early morning or late afternoon, so cold water never hits hot glass
  • Fresh-water rinse for salt film at coastal Chattogram sites

Thermal imaging & IV-curve testing

We find the fault before it finds your revenue.

A hotspot is invisible from the roof walkway. A drone thermal survey sees it in minutes; an IV-curve trace tells us exactly what is wrong with the string.

  • 01IR thermographyHotspots, failed bypass diodes, cracked cells and overheating connectors — flagged by drone in hours, not days.
  • 02IV-curve tracingSeparates soiling, mismatch, rising series resistance and PID so each fault gets the right fix.
  • 03Insulation resistanceCatches moisture ingress in monsoon humidity before it becomes a ground fault or arc.
Book a diagnostic survey

IR drone survey · 42 m altitude · 13:10

IV curve · INV-04 / STR-0726 × 590 W modules · traced at 870 W/m², corrected to STCHealthy referenceDegraded string
05101503507001,0501,400Voltage, VCurrent, APmax 15.5 kWPmax 11.8 kW · −24%123
  1. 1Lower short-circuit currentSoiling and cell degradation cut current across the whole curve.
  2. 2Softer kneeRising series resistance — loose terminals, corroded MC4s, damaged ribbons.
  3. 3Step in the curveA bypass diode is carrying current around a cracked or hotspotting module.

AMC packages

Three contracts. One standard of work.

Every tier gets the same checklist, the same trained technicians and the same portal. What changes is how often we visit, how deep we test and how fast we respond.

Annual maintenance contract packages compared
CriteriaBasicTk 500 / kWp / yrMost chosenStandardTk 800 / kWp / yrPremiumTk 1,150 / kWp / yr
Scheduled site visitsQuarterlyMonthlyMonthly + on-call engineer
Module cleaningOwner's crew, trained by usUp to 24 cycles / yrSoiling-triggered, unlimited
Visual, torque & safety inspectionYesYesYes
Inverter & combiner servicingAnnualSemi-annualQuarterly
IR thermographyAnnual, handheldAnnual drone surveySemi-annual drone survey
IV-curve testingNo10% of strings / yr100% of strings / yr
Insulation & earthing testsYesYesYes
Pre-monsoon & cyclone readinessNoYesYes
Monitoring tier includedMonitorMonitor + ReportNOC Assured
Critical spares heldNoFuses, MC4, SPDsIncl. spare inverter
P1 on-site response48 h24 h8 h
Performance guaranteeNoNoPR ≥ 79% with LDs
Get a Basic quoteGet a Standard quoteGet a Premium quote

Prices exclude VAT, replacement parts outside warranty and access equipment for roofs above 15 m. Minimum 3-year term. Indicative prices.

Response-time SLA

When something breaks, the clock is in the contract.

Targets are measured from the alarm time-stamp and reported every month. Miss one on Premium and service credits apply.

Fastest on-site response8hours

How alarms are escalated
  • P1Critical
    Typical trigger
    Plant offline, more than 25% of capacity lost, arc fault, fire or safety hazard
    Basic
    Ack1 hOn site48 h
    Standard
    Ack30 minOn site24 h
    Premium
    Ack15 minOn site8 h
  • P2Major
    Typical trigger
    Inverter down, 5–25% of capacity lost, or PR more than 5 points below forecast
    Basic
    Ack4 hOn site72 h
    Standard
    Ack1 hOn site48 h
    Premium
    Ack30 minOn site24 h
  • P3Minor
    Typical trigger
    String fault, datalogger or comms loss, under 5% of capacity affected
    Basic
    AckNext working dayOn siteNext visit
    Standard
    Ack4 hOn site5 days
    Premium
    Ack2 hOn site72 h
  • P4Advisory
    Typical trigger
    Soiling trend, vegetation, drainage or cosmetic defects
    Basic
    AckQuarterly reportOn siteNext visit
    Standard
    AckWeekly digestOn siteNext visit
    Premium
    AckDaily digestOn site7 days max

Clock starts at the alarm time-stamp (Asia/Dhaka). On-site targets apply within 150 km of Dhaka or Chattogram; add 12 h beyond. Acknowledge = a named NOC analyst has triaged the alarm and contacted your site lead.

Chattogram · June 2024

Maintenance in practice

850 kWp rooftop for a bonded warehouse

Result
1.1 GWh
clean energy per year
Sector
Commercial
Client
Logistics & bonded warehouse

The challengeCoastal salt air and cyclone-season wind loads on a lightweight steel roof.

The resultCame through the 2024 cyclone season with zero module displacement and 99.6% availability.

FAQ

Maintenance questions we hear every week

Cleaning, takeovers, warranties and what the guarantee really covers.

Ask an engineer

It depends on the site, not the calendar. Plants near brick kilns and highways typically need weekly cleaning from November to April; the same plant may need only one or two cleans a month in the monsoon. We schedule from the soiling index, not a fixed rota.

Yes. We start with a takeover audit — IR scan, IV sampling, document review — and give you a written defects list before the AMC starts, so pre-existing issues are clear.

Not when done right. We use soft brushes and low-TDS water, clean early morning or late afternoon to avoid thermal shock, and never use high-pressure jets that void module warranties.

On Premium, we guarantee a weather-corrected annual PR. If the plant falls short for reasons within our scope, liquidated damages are paid against the lost energy.

Consumables (filters, fuses, connectors, cable ties) are included on Standard and Premium. Major components are covered by OEM warranty, which we claim and manage on your behalf.

Free · no obligation

Find out what your plant is losing — before you sign an AMC.

We'll run a one-day health check: thermal scan, IV sampling and a soiling measurement, with a written defects list you keep either way.

What you receive

  • 01IR thermography spot survey
  • 02IV-curve sampling on flagged strings
  • 03Defects list and AMC recommendation