1.2 MWp floating solar pilot on an industrial lagoon

+8.2% yield vs ground-mount — Agro-processing group, Mymensingh.

Capacity
1.2 MWp
Location
Mymensingh
Commissioned
January 2026
Solution type
Floating

Case study

From first survey to measured result.

Client
Agro-processing group
Sector
Industrial
District
Mymensingh
System
1.2 MWp

1. The challenge

No free land beside the plant, but a 3-hectare treated-water lagoon with 2.8 m seasonal level swing.

2. Our approach

HDPE float islands with elastic mooring sized for monsoon level change and a floating cable tray to a shore-side inverter station.

3. The result

Water cooling delivers an 8.2% specific-yield gain against a nearby ground-mount reference array.

+8.2%yield vs ground-mount

Performance

Generation, measured every month.

Metered AC output from the plant's monitoring platform, against the P50 forecast we committed to at design stage.

Generated over 12 months
1,523MWh
Against P50 forecast
+7.0%vs 1,424 MWh
Specific yield
1,269kWh/kWp·yr

Monthly generation, MWh

Actual metered output against the P50 expected yield. Shaded area shows generation above forecast.

  • Expected (P50 model)
  • Actual generation
050100150200JanMarMayJulSepNov
Source: plant monitoring platform, 12-month record.

We turned the one space we couldn't use into our power plant.

Managing DirectorAgro-processing group+8.2%yield vs ground-mount

Free · no obligation

Want numbers like these on your own site?

Share a year of electricity bills and a roof or land plan. We'll model the yield, the payback and the right system — free and without obligation.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616