2.4 MWp net-metered array across a denim mill

3.9 yrs simple payback — Denim mill, Narayanganj.

Capacity
2.4 MWp
Location
Narayanganj
Commissioned
November 2024
Solution type
Net-metering

Case study

From first survey to measured result.

Client
Denim mill
Sector
RMG & Textiles
District
Narayanganj
System
2.4 MWp

1. The challenge

A buyer-mandated renewable target for 2026 and a roof shared by four separate buildings with different pitches.

2. Our approach

Unified SCADA across four inverter groups, net-metering application with DPDC handled end-to-end, and night-time installation windows to keep production running.

3. The result

3.1 GWh a year of clean generation, documented for buyer sustainability audits, with payback tracking at 3.9 years.

3.9 yrssimple payback

Performance

Generation, measured every month.

Metered AC output from the plant's monitoring platform, against the P50 forecast we committed to at design stage.

Generated over 12 months
2,899MWh
Against P50 forecast
+2.7%vs 2,823 MWh
Specific yield
1,208kWh/kWp·yr

Monthly generation, MWh

Actual metered output against the P50 expected yield. Shaded area shows generation above forecast.

  • Expected (P50 model)
  • Actual generation
0100200300400JanMarMayJulSepNov
Source: plant monitoring platform, 12-month record.

The audit trail mattered as much as the kilowatts. Our buyers see the data now.

Director, SustainabilityDenim mill, Narayanganj3.9 yrssimple payback

Free · no obligation

Want numbers like these on your own site?

Share a year of electricity bills and a roof or land plan. We'll model the yield, the payback and the right system — free and without obligation.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616