In development · Target COD 2028

IPP · Utility

50 MWp grid-connected solar park (under development)

69 GWh projected annual generation — IPP · BPDB offtake, Pabna.

Capacity
50 MWp
Location
Pabna
Commissioning
Target COD 2028
Solution type
IPP

Case study

From first survey to measured result.

Client
IPP · BPDB offtake
Sector
Utility
District
Pabna
System
50 MWp

1. The challenge

Assembling 175 acres of non-agricultural land and a grid connection at a congested substation.

2. Our approach

Land aggregated on char land with no crop displacement; grid impact study commissioned with PGCB; tariff negotiation in progress.

3. The result

Feasibility and grid study complete; financing term sheets under negotiation.

69 GWhprojected annual generation

Projected performance

Generation, modelled before a single pile is driven.

This project has not reached commercial operation, so there is no metered data yet. The profile below is the P50 yield model used for financing.

Projected specific yield
1,426kWh/kWp·yr
Peak generation month
May7.3 GWh
Status
Target COD 2028

Projected generation, GWh per month

P50 energy yield estimate for the first operating year. No operating data yet.

02468JanMarMayJulSepNov
Source: pre-construction yield assessment. Subject to final design and grid study.

Clear data and a disciplined development plan.

Lender's technical adviserDevelopment finance institution69 GWhprojected annual generation

Free · no obligation

Want numbers like these on your own site?

Share a year of electricity bills and a roof or land plan. We'll model the yield, the payback and the right system — free and without obligation.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616