Skip to content
EMERGEDPower Distribution

Operating since December 2024

Net-metering · Healthcare & Education

180 kWp rooftop for a school & college campus

Tk 2.6 lakh saved per month — Private school & college, Cumilla.

Capacity
180 kWp
Location
Cumilla
Commissioned
December 2024
Solution type
Net-metering

Case study

From first survey to measured result.

Client
Private school & college
Sector
Healthcare & Education
District
Cumilla
System
180 kWp

1. The challenge

A tight capex budget and daytime-only load with long summer holidays.

2. Our approach

Net-metering so holiday generation earns export credit; RESCO lease with zero upfront cost.

3. The result

The campus saves around Tk 2.6 lakh a month with no capital outlay.

Tk 2.6 lakhsaved per month

Performance

Generation, measured every month.

Metered AC output from the plant's monitoring platform, against the P50 forecast we committed to at design stage.

Generated over 12 months
215MWh
Against P50 forecast
+4.4%vs 206 MWh
Specific yield
1,194kWh/kWp·yr

Monthly generation, MWh

Actual metered output against the P50 expected yield. Shaded area shows generation above forecast.

  • Expected (P50 model)
  • Actual generation
0102030JanMarMayJulSepNov
Source: plant monitoring platform, 12-month record.

No upfront cost and a lower bill from month one.

PrincipalSchool & college, CumillaTk 2.6 lakhsaved per month

Free · no obligation

Want numbers like these on your own site?

Share a year of electricity bills and a roof or land plan. We'll model the yield, the payback and the right system — free and without obligation.

What you receive

  • 01Structural & shading survey
  • 02Sized system and single-line diagram
  • 03Savings forecast and payback period
Prefer to talk? +880 1670797616